editable · Word + Excel + PDF · no subscription

Instant zip download · check email twice if it bounces

APQP kit

APQP for a 3-person plastic-parts shop

Phase gates, PPAP, and the control plan — the phase-4 paperwork the bundle sets up first.

← Open the APQP kit

FAI kit

FAI prep kit for a CM hand-off

The DFMEA + dimensional inspection kit a studio hands a supplier on inspection day.

← Open the FAI kit

BoM kit

BoM ledger for a CM hand-off

Excel / Airtable / Notion ledger kit — the parts-list tracking the supplier revisions are tracked against.

← Open the BoM kit

ECR kit

ECR loop kit for a 3-person studio ↔ CM

How the studio closes a change-order loop with the CM — the paperwork that closes the package once the supplier replies.

← Open the ECR kit

About

Chester / the Specvault line

Who is behind the kits, and where the four-sub-niche roadmap is heading.

About the line →

See how Specvault compares to generic Gumroad template shops →

also in the line

Chester / the Specvault line →who is behind the four kits, and where the line is heading next.